PUMP HIGH PRESSURE
The Navy seeks repair of a high-pressure pump (CAGE 0UTW4, ref 905-09254-000) under a bilateral RFQ award requiring the contractor’s signed acceptance. The contractor must meet a 118-day repair turnaround time from CAV-recorded asset return to Government acceptance, with price reductions for inexcusable delays; Government Source Inspection is required, freight is FOB Origin, and the Navy handles freight under the CAV SOW. Quotes should include unit/total price, proposed RTAT and capacity constraints if the 118-day RTAT cannot be met, pricing basis or historical invoice if applicable, beyond-repair T&E fee, new-unit price and lead time for comparison, and proof of authorized-distributor status if applicable. The Government intends to add an option quantity exercisable within 365 days of award, and accelerated delivery is encouraged. Repair must follow OEM/approved standards with MIL-STD-130 marking and MIL-STD-2073 packaging; if additive manufacturing is used, mandatory master traceability ledger/CDRL requirements apply.