PUMP,CENTRIFUGAL
This is a Navy RFQ for repair of a centrifugal pump (CAGE 83130, ref PL-5.0 ASLD-11), to be performed at the contractor’s facility, with award issued bilaterally requiring the contractor’s signed acceptance. The Government requires a Repair Turnaround Time of 239 days from asset return to Government acceptance, with price reductions for inexcusable late delivery, and Government Source Inspection is required. Quotes must include unit and total price, proposed RTAT, capacity constraints if unable to meet the required RTAT, pricing basis/historical invoice information if applicable, and beyond-repair testing/evaluation pricing. The contractor must report receipt via CAV, perform repair to OEM specifications, maintain inspection records for 365 days, and comply with MIL-STD-130 marking and MIL-STD 2073 packaging. Freight is FOB Origin with the Navy handling freight under the CAV Statement of Work, and accelerated CASREP delivery is encouraged at no additional cost to the Government.