ACTUATOR,HYDRAULIC-
This opportunity is for the manufacture or refurbishment of an Actuator, Hydraulic, with a required Repair Turn Around Time (RTAT) of 300 days. The contractor must submit a Firm-Fixed Price (FFP) quote for the full repair effort within 90 days after receipt of the carcass(es). The work involves inspection, refurbishment to specific drawings, and compliance with military standards, with final inspection and acceptance by the government. The contract will be DO-certified for national defense under the Defense Priorities and Allocations System (DPAS). The location for performance of services is not specified.