VALVE,STOP AND STOP
This is a procurement for the manufacture of a 1/2 Inch IPS, Seawater Service, Socket Weld End Connections, Stop Check Valve, designated as SPECIAL EMPHASIS material for a crucial shipboard system. The contractor must supply a one-year warranty from the date of delivery. A key performance timeline requires final delivery of material within 450 days. The work involves handling classified and confidential documents, and the contractor must have a quality system in accordance with ISO-9001 or equivalent, with significant First Article Testing and certification requirements.