ACTUATOR,HYDRAULIC-
This is a complex, high-priority repair contract for a critical SUBSAFE shipboard component, requiring the contractor to perform a 90-day teardown and evaluation followed by a full repair with a requested repair turnaround time (RTAT) of 200 days. The prime contractor must be the Original Equipment Manufacturer (OEM) for this sole-source repair. Performance requires adherence to extensive quality assurance standards, including ISO-9001 or MIL-I-45208, and specific welding, testing, and documentation protocols for SUBSAFE/Non-Level I material. The contract will be DO-certified under the Defense Priorities and Allocations System (DPAS).