CIRCUIT CARD ASSEMB
This is a Navy repair requirement for a CIRCUIT CARD ASSEMB under a total small business set-aside, and the modification removes the options clause while leaving all other terms unchanged. Repairs must meet CAGE 1BCK1 reference 74321-1REV2.5.1.0 and the contractor’s approved repair/overhaul practices, with MIL-STD-130 marking, MIL-STD-1686 ESD control, and inspection/testing to original manufacturer specifications and drawings. The estimated RTAT is 197 days and becomes an enforceable delivery date unless excused or Government-delayed; it must include repair of the carcass to “A” condition and packaging/shipment back to the Navy. Packaging and marking follow MIL-STD 2073 and the contract schedule, and inspection records must be retained for 365 calendar days after final delivery. A one-year warranty after delivery applies, with defects to be reported within 45 days of discovery.