48--VALVE,SAFETY RELIEF, IN REPAIR/MODIFICATION OF
This is a repair requirement for a VALVE,SAFETY RELIEF, with an estimated turnaround time (RTAT) of 321.2 days, which will result in an enforceable delivery date. The contractor must perform all repair work in accordance with their standard practices and approved documents, ensuring the item meets the operational and functional requirements of the specified cage code and reference number. The item must be marked per MIL-STD-130, and the material must be free of metallic mercury and mercury contamination. Quality assurance requires the contractor to maintain inspection records for 365 calendar days after final delivery. The location for performance is not specified, and no budget amount is provided.