VALVE,REGULATING,SY
This amendment adds additive manufacturing interchangeability requirements and a DD Form 1423/CDRL to a repair requirement for the VALVE,REGULATING,SY under an existing Basic Ordering Agreement. Repair work must follow contractor overhaul practices for CAGE 73030 reference NV822187-1, including MIL-STD-130 marking, mercury-free material controls, MIL-STD-2073 packaging, and Government source inspection/acceptance. Quotes must include unit and total price, repair turnaround time, RMA if applicable, and awardee/inspection/performance CAGE information; freight is FOB Origin and award requires the contractor’s written acceptance. If additive manufacturing is used, the contractor must maintain and submit a Master Component Traceability Ledger to the NAVSUP HQ AM mailbox and WAWF, with initial submission within five business days of DCMA QAR on-site validation and before packaging/shipping. Updated traceability submissions are required if process travelers, inspection metrology, or material feedstock pedigree change.