30--CYLINDER ASSEMBLY,A, IN REPAIR/MODIFICATION OF
This is a repair requirement for a Cylinder Assembly, A, to be restored to "A" condition. The estimated repair turnaround time (RTAT) is 188.87 days, which includes the time for repair and shipment back to the Navy. The work must be performed in accordance with specific military standards, and the supplied material must be free from mercury contamination. The contractor is responsible for all inspection and quality assurance, maintaining records for 365 days after final delivery.