This is a firm-fixed-price contract for the repair of a Synchro Amplifier, requiring the contractor to be an authorized repair source. The government requests a Repair Turnaround Time (RTAT) of 80 days from asset receipt at the contractor's facility, with a monthly throughput constraint to be specified by the bidder and an induction period of 365 days from award. A significant price reduction per unit, per month will be applied for failing to meet the RTAT due to contractor delay, with the reduction amount to be proposed by the bidder. The evaluation will be based on the Lowest Price Technically Acceptable (LPTA) source selection process. The performance location is not specified.