ACTUATOR,ELECTRO-ME
This is a firm-fixed-price RFQ for the repair of an electro-mechanical actuator, requiring the contractor to be an authorized repair source. The government requests a Repair Turnaround Time (RTAT) of 133 days from asset receipt at the contractor's facility, with a required monthly throughput constraint to be specified by the bidder and an induction period of 180 days post-award. A significant price reduction per unit, per month will be applied for missing the RTAT due to contractor delay, with the reduction amount to be proposed by the bidder. The quote must include specific pricing, RTAT, CAGE codes, and a cost breakdown. Performance requires adherence to strict packaging, inspection, and item identification standards, including MIL-STD-130 and IUID requirements.