STARTER,AIR TURBINE
This is a firm-fixed-price RFQ for the repair of an Air Turbine Starter, requiring the contractor to be an authorized repair source. The performance location is not specified. The government requires a Repair Turnaround Time (RTAT) of 133 days from asset receipt, with a monthly throughput constraint to be specified by the bidder and an induction period expiring 180 days after contract award. A significant price reduction per unit will be applied for each month the contractor fails to meet the RTAT due to inexcusable delay. Quotes must include detailed pricing, RTAT, capacity constraints if applicable, and relevant CAGE codes.