48--VALVE FUEL, IN REPAIR/MODIFICATION OF
This is a firm-fixed-price solicitation for the repair of a fuel valve, requiring the contractor to be an authorized repair source. The government requests a Repair Turnaround Time (RTAT) of 211 days from asset receipt, with strict monthly throughput requirements and a 365-day induction period from contract award. A significant price reduction per unit will be applied for each month the contractor fails to meet the RTAT due to inexcusable delay. The performance location is the contractor's own facility, as assets must be shipped there for repair. Quotes must include detailed pricing, RTAT, capacity constraints, and CAGE code information.