RADIO FREQUENCY MAN
This is a firm-fixed-price RFQ for the repair of a Radio Frequency Man, requiring the contractor to be an authorized repair source. The performance location is not specified. The government requests a Repair Turnaround Time (RTAT) of 115 days from asset receipt, with a mandatory monthly throughput constraint and an induction expiration date of 180 days after contract award. A significant price reduction per unit will be applied for each month the contractor fails to meet the RTAT due to inexcusable delay. Quotes must include detailed pricing, RTAT, CAGE codes, and a cost breakdown, with a minimum 90-day quote expiration.