POWER DISTRIBUTION-
This is a firm-fixed-price solicitation for the repair of a POWER DISTRIBUTION unit, requiring the contractor to be an authorized repair source. The performance location is not specified. The government requests a Repair Turnaround Time (RTAT) of 232 days from asset receipt to acceptance, with a required monthly throughput constraint to be specified by the bidder and an induction period of 365 days after award. A significant price reduction per unit, per month will be applied for failing to meet the RTAT due to contractor delay, with the specific reduction amounts to be proposed by the bidder. Quotes must include detailed pricing, RTAT, CAGE codes, and a minimum 90-day expiration.