59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
This is a firm-fixed-price solicitation for the repair of a Circuit Card Assembly, requiring the contractor to be an authorized repair source. The government requests a Repair Turnaround Time (RTAT) of 218 days after asset receipt, with strict price reduction penalties for missing this deadline. The contractor must provide a monthly throughput capacity and the induction period expires 365 days after contract award. Quotes must include detailed pricing, RTAT, and CAGE code information, with a minimum 90-day quote expiration. The performance location is the contractor's own facility, as it is an FOB Source shipment for repair.