COUPLING,SHAFT,FLEX
This opportunity is for the repair of a COUPLING,SHAFT,FLEX, with the solicitation window reopened through 17JUNE 2026 and extended to 05 MAY 2026. The total quantity has been increased from 3 to 6, and accelerated delivery is encouraged. The required Repair Turnaround Time (RTAT) is 134 days, measured from asset receipt at the contractor's facility to government acceptance. All freight is FOB Origin and handled by the Navy, and Government Source Inspection (GSI) is required. The performance location is determined by the contractor's facility, where the asset will be shipped for repair.