GUN,CONTROL UNIT
This is a Navy repair requirement for the GUN,CONTROL UNIT, with repair work required to meet original manufacturer CAGE 53711 reference 6181444 and applicable repair/overhaul standards. The Government seeks a Repair Turnaround Time (RTAT) of 128 days, encourages accelerated delivery before the scheduled delivery date(s), and requires Government Source Inspection. Freight is FOB Origin but handled by the Navy under the Commercial Asset Visibility Statement of Work, and all pricing is firm; quotes must include unit/total price, RTAT, capacity constraints if 128 days cannot be met, pricing basis, and CAGE information for the awardee, inspection/acceptance, and the facility/subcontractor where the asset will be shipped. The item is a Critical Safety Item and requires MIL-STD-130 marking and MIL-STD-2073 packaging, with inspection records retained for 365 calendar days after final delivery. Award will be issued bilaterally, requiring the contractor’s signed acceptance, and consideration is limited to authorized distributors of the original manufacturer unless proof of authorization is provided.