CIRCUIT CARD ASSEMB
N0010426QQC18
This opportunity is for the repair of a CIRCUIT CARD ASSEMBLY for the U.S. Navy. The required Repair Turnaround Time (RTAT) is 730 days, measured from asset receipt at the contractor's facility to government acceptance. The contract will be firm-fixed-price, and the performance location is at the contractor's facility, with freight handled by the Navy. The government intends to include an option for increased quantity, exercisable within 365 days. All repair work must meet the original manufacturer's specifications, and Government Source Inspection (GSI) is required.