CIRCUIT CARD ASSEMB
This opportunity is for the repair of a CIRCUIT CARD ASSEMBLY for the U.S. Navy. The required Repair Turnaround Time (RTAT) is 77 days, measured from asset receipt at the contractor's facility to government acceptance. The contract will be firm-fixed-price, and the location for performance is at the contractor's facility, with the awardee's CAGE code to be provided. The government intends to add an option for increased quantity, with delivery continuing at the same rate as the base contract. All repair work must meet operational and functional requirements per specified standards, including MIL-STD-130 marking and IPC J-STD-001 Class 3 soldering.