CIRCUIT CARD ASSEMB
This is a Navy repair requirement for a CIRCUIT CARD ASSEMB under Emergency Acquisition Authority, and if the offeror has a BOA, the BOA terms control over conflicting RFQ/order terms. The award will be bilateral requiring the contractor’s signed acceptance, and Government Source Inspection is required. Quotes must include unit and total price, proposed Repair Turnaround Time (RTAT) or capacity constraints if not meeting the Government’s required RTAT, RMA if applicable, and delivery vehicle if using a current BOA/IDIQ. Freight is FOB Origin, with the Navy handling freight per the CAV Statement of Work, and the contractor must report receipts in CAV by the end of the fifth business day after physical receipt, with RTAT measured from asset return to Government acceptance. The contractor must provide CAGE information for the awardee, inspection/acceptance, and facility/subcontractor where the asset will be shipped, and repair must follow original manufacturer specs, ESD controls, marking, and packaging requirements.