SERVO,ELEVATION
This is a repair contract for a SERVO,ELEVATION item, with a required Repair Turnaround Time (RTAT) of 730 days from physical receipt of the asset at the contractor's facility. Performance will be at the contractor's facility, with Government Source Inspection required and all freight FOB Origin. Accelerated delivery is encouraged, and the contractor must be an authorized distributor of the original manufacturer's item. The contract includes cybersecurity maturity model certification requirements, configuration control, and MIL-STD-130 marking. Failure to meet the RTAT will result in price reductions per unit per month unless the delay is excusable.