POWER SUPPLY
This is a firm-fixed-price contract for the repair of a power supply, requiring a Repair Turnaround Time (RTAT) of 82 days from the asset's physical receipt at the contractor's facility. The performance location is not specified. The contract includes significant quality assurance requirements, such as compliance with ISO 9001, MIL-STD-130 for marking, and IPC J-STD-001 for soldering. A Government Source Inspection (GSI) is required, and the contractor must report all transactions through the Commercial Asset Visibility (CAV) system. The solicitation encourages accelerated delivery and includes provisions for price reductions if the contractor fails to meet the required RTAT without an excusable delay.