False

CONTROL,POWER SUPPL

Notice ID:N0010426QQB03

This is a U.S. Navy solicitation for the repair of a power supply control unit, requiring a Repair Turnaround Time (RTAT) of 205 days after asset receipt. The performance location is the contractor's facility, and Government Source Inspection (GSI) is required at that location. The contract includes specific quality assurance, packaging, and marking requirements, and mandates the use of the Commercial Asset Visibility (CAV) system for tracking. Late deliveries that are not excusable will incur a price reduction per unit per month, as specified by the contractor in their quote.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   6130 CONVERTERS, ELECTRICAL, NONROTATING
LOCATION: Not Given
Primary Contact
Telephone: 7176051234
Not Given

Links (1)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »