CIRCUIT CARD ASSEMB
This is a solicitation for the manufacture of a CIRCUIT CARD ASSEMBLY, requiring strict adherence to specified design, quality, and documentation standards. The contractor must be an authorized distributor of the original manufacturer's item and provide proof of authorization with their offer. Government source inspection is required, and the contractor is responsible for maintaining all inspection records for 365 days after final delivery. The performance location is not specified, and no budget or non-bid timelines are mentioned. The order incorporates the terms of an existing Basic Ordering Agreement (BOA) if applicable, and all freight is FOB Origin.