VALVE,PRESS REDUCIN
The requirement is for a complete pressure reducing valve assembly, quantity three, in accordance with Marotta Valve Corporation drawing 281770-0001, model RV29G-3, except as amplified or modified, for a critical shipboard system and designated SPECIAL EMPHASIS material. The contractor must perform oxygen cleaning per MIL-STD-1330 and provide material and test certifications, production testing, NDT/dye penetrant inspection, and approved welding/brazing procedures and qualification data before production or repair welding. The supplier must maintain an ISO-9001 or MIL-I-45208 quality system, support Government source quality assurance and configuration control, and submit certificate of compliance and required CDRL data. If the offeror is not the OEM, it must identify the OEM by company name and CAGE and provide a signed OEM distributor authorization letter; packaging at a different facility must also be identified. A one-year warranty from delivery applies, and new welding procedure qualification requires at least 72-hour advance notification to DCMA.