DISPLAY UNIT
This opportunity is for the repair of a DISPLAY UNIT, with the contractor required to perform a teardown and evaluation (TD&E) within 90 days of receiving carcasses and then submit a firm-fixed price quote for the full repair effort. The required Repair Turn Around Time (RTAT) is 180 days, and failure to meet this will result in price reductions. The contractor must be an authorized distributor of the Original End Manufacturer (OEM), or provide a signed letter of authorization, and all repair work must meet the operational and functional requirements of the specified Cage Code and reference number. The contract is certified for national defense under the Defense Priorities and Allocations System (DPAS) and includes strict requirements for mercury-free materials. The location for performance of services is not specified in the description.