61--POWER SUPPLY, IN REPAIR/MODIFICATION OF
This U.S. Navy requirement is for the repair of POWER SUPPLY, SERVER, AUTOMATI, and SERVER, AUTOMATIC DA items. The contractor will have 180 days after receipt of carcasses to complete a teardown and evaluation and submit a firm-fixed-price quote for the full repair effort. The required Repair Turn Around Time (RTAT) must be proposed, and failure to meet it will incur a price reduction. All repair work must meet operational and functional requirements, and the material must be mercury-free for use on submarines or surface ships. The location for performance of services is not specified.