PANEL,POWER DISTRIB
This is a U.S. Navy requirement for the repair of a Power Distribution Panel, requiring the contractor to perform a teardown and evaluation within 90 days of receiving the carcass(es) and to complete the full repair within a requested Repair Turn Around Time (RTAT) of 180 days. The performance location is not specified. The contract includes a warranty of one year from the date of delivery and specific quality requirements, including that all work must be mercury-free. If the bidder is not the Original Equipment Manufacturer (OEM), they must provide a signed letter of authorization from the OEM.