CCA,DISCRETE MULTI
This is a Navy repair requirement for the CCA, DISCRETE MULTI (CAGE 16331, ref. no. 63E917150G1), to be repaired per the contractor’s approved repair/overhaul standards and applicable drawings/manuals. The required Repair Turnaround Time is 247 days from physical receipt to Government acceptance, with Government Source Inspection required and price reductions for inexcusable contractor delays. Freight is FOB Origin, with Navy handling shipment under the CAV Statement of Work, and packaging/marking includes MIL-STD-2073 and MIL-STD-130. Quality requirements include ISO 9001, IPC J-STD-001 Class 3 soldering, and inspection/testing to original manufacturer specifications. The Government intends to add a 100% option quantity exercisable within 365 days of contract award at the same delivery turnaround; quotes must include pricing, RTAT/capacity constraints, RMA, option pricing, and BR/BER testing evaluation details.