PUMP UNIT,CENTRIFUG
N0010426QLB52
This opportunity is for the repair of a PUMP UNIT, CENTRIFUG, with performance required at the contractor's facility. The government requires a Repair Turnaround Time (RTAT) of 100 days, measured from asset receipt to government acceptance, with accelerated delivery encouraged. The contract will be firm-fixed-price, and the government intends to include an option to increase the quantity. Failure to meet the required RTAT will result in a price reduction per unit per month, unless the delay is excusable. All freight is FOB Origin, and Government Source Inspection (GSI) is required.