CIRCUIT CARD ASSEMB
This opportunity is for the repair of a Circuit Card Assembly, with the quantity reduced from 183 to 172 units. The required Repair Turnaround Time (RTAT) is 180 days, with a price reduction penalty for late delivery, and accelerated delivery is encouraged. All freight is FOB Origin, and performance location is determined by the contractor's facility where the asset is shipped. The contract will be awarded bilaterally and requires Government Source Inspection (GSI). The due date for this action has been extended to 17 APR 2026.