PUMP,CENTRIFUGAL
This opportunity is for the repair of a centrifugal pump, with performance required at the contractor's facility. The government is seeking a Repair Turnaround Time (RTAT) of 239 days, measured from asset receipt to government acceptance. The contract will be firm-fixed-price, and the government intends to add an option for increased quantity, with delivery continuing at the same rate. Failure to meet the required RTAT will result in a price reduction per unit per month, up to a specified maximum. All freight is FOB Origin, and the contractor must be an authorized distributor of the original manufacturer's item.