INDICATOR,ELECTRICA
This is a government RFQ for the repair of an electrical indicator, with a required Repair Turnaround Time (RTAT) of 97 days from asset receipt to acceptance. The contract will be firm-fixed-price and includes an option for the government to increase the quantity within 365 days of award. Performance location is tied to the contractor's facility CAGE code, and government source inspection is required. The solicitation includes significant quality assurance, packaging, and documentation requirements, and notes that failure to meet the RTAT will result in specified price reductions per unit.