PUMP,CENTRIFUGAL
This is a firm-fixed-price contract for the repair of two specific centrifugal fuel pump models (Part Numbers 2525-1 and 2526-2) used in the Navy's LCAC system. The Government requires a Repair Turnaround Time (RTAT) of 124 days, measured from the physical receipt of the asset at the contractor's facility. The contractor must submit detailed repair and testing procedures for Government approval prior to starting work, a process that requires at least 10 working days for review. The performance location is the contractor's own facility, and the quote must include a proposed price reduction amount per unit for each month the required RTAT is not met.