CONNECTION,FLEXIBLE
This opportunity is for a Level 1 repair of Special Emphasis material used in a crucial shipboard system, with performance at the contractor's facility. The contractor must refurbish the item to specific drawings and standards, including rigorous testing, certification, and configuration control. Final delivery of material is required within 365 days after the effective date of the contract, with certification data due 20 days prior to scheduled delivery. The contract will be a DO-rated order under the Defense Priorities and Allocations System, and the government will handle shipping. No budget amount is specified in the description.