CABLE ASSEMBLY,SPEC
This is a total small business set-aside for a critical shipboard cable assembly, designated as Special Emphasis (Level I) material due to the high risk of personnel injury or ship loss if defective. The contractor must manufacture the cable assembly per NAVSEA drawings and specifications, using approved vendors for plasma spray coating and molding, and comply with stringent quality, traceability, and first article testing requirements. The delivery schedule includes final material delivery 400 days after contract award, with certification data due 20 days prior and weld procedures due 120 days after award. Performance of services is at the contractor’s facility, with government quality assurance at source, and the location cannot be changed without authorization. No budget amount is specified.