LOWER DOOR ASSEMBLY
This opportunity is for a **Special Emphasis (Level I) Lower Door Assembly** used in a crucial shipboard system, where failure could cause serious injury or loss of life. The contractor must deliver the assembly per specific Kollmorgen drawings and provide certifications for materials, non-destructive tests, and hydrostatic testing. **Final delivery of material is required within 365 days after the contract's effective date**, with certification data due 20 days prior. The work is subject to a **DO-rated order** for national defense, and the contractor must maintain a quality system per ISO-9001 with a Navy-approved calibration system. No specific budget amount or performance location is stated in the description.