VALVE,BALL
The Navy requires manufacture of a Buoyant Cable Antenna Shear Valve per Naval Ship System Command drawings 4677518 and 4687773, with special-emphasis/quality-assured controls because the material supports a crucial shipboard system. Requirements include certified materials, non-destructive and pressure testing, welding/brazing controls, configuration control, and access to classified documents, including CONFIDENTIAL drawing 4640418. The small-business set-aside has been dissolved, and the resulting order will be a DPAS “DO” rated order issued under Emergency Acquisition Flexibilities. Final material delivery is due on or before 365 days after the effective date of the resulting contract; certification CDRLs are due 20 days before scheduled delivery, and PNSY review/acceptance takes 30 working days after receipt. Contract administration and quality review involve NAVSUP WSS Mechanicsburg and Portsmouth Naval Shipyard, with FOB destination terms.