BONNET ASSEMBLY
This is a total small business set-aside for a Special Emphasis (Level I) bonnet assembly used in a crucial shipboard system, with final delivery required 365 days after the contract's effective date. The contractor must provide and maintain a quality system per ISO-9001 (or MIL-I-45208 as an alternate) and submit certification data, including an Inspection and Test Plan, at least 20 days before scheduled delivery. Performance of services will be at the contractor's facility, with Government Quality Assurance performed at that source, and the place of performance cannot be changed without authorization. The material must be manufactured in accordance with NAVSHIPS drawing 803-2177525, with specific requirements for chemical/mechanical analysis, dye penetrant inspection, and welding per Navy standards. Only sources with an acceptable Quality Control Manual are eligible for award, and the contract will be a DO-rated order certified for national defense use under the Defense Priorities and Allocations System.