VALVE,CONTROL
This is a not-to-exceed, firm-fixed-price repair/refurbishment requirement for Special Emphasis SUBSAFE/Non-Level I shipboard material. The prime contractor must be the OEM for sole-source repair and must inspect/refurbish the item per CAGE 78062 drawing 20380-001 and Maintenance Standard MS 5560-081-055 Rev B CHG 4, using NAVSEA-approved MRO procedure Sargent Engineering Document 11-000001 Rev. K dated 9/7/17. Award will be based on a not-to-exceed quote subject to downward negotiations, with definitization after receipt of a detailed repair proposal for each item including recommended repair components, delivery schedule, and informal cost breakdown. Contractors must meet ISO 9001/calibration quality-system requirements, provide serial-number traceability and Certificates of Compliance/Tests, submit welding/brazing procedures