STEM,FLUID VALVE
This opportunity is a total small business set-aside for the manufacture of a stem for a hull and backup ball valve, designated as SPECIAL EMPHASIS (Level I) material for a crucial shipboard system. The contractor must provide and maintain a quality system in accordance with ISO-9001, with strict requirements for material traceability, certification, and configuration control. Performance of services is subject to Government Quality Assurance at source, and the place of performance cannot be changed without authorization. Final delivery of material is required on or before 365 days after the effective date of the resulting contract, with certification data due 20 days prior to scheduled delivery. Access to NOFORN and/or Naval Nuclear Propulsion Information is required for this requirement.