ACTUATOR,HYDRAULIC-
This is a repair contract for a critical shipboard SUBSAFE component, requiring the contractor to perform a full teardown, evaluation, inspection, and repair to "like new" condition. The Prime Contractor must be the Original Equipment Manufacturer (OEM) for this sole-source repair. The performance location is not specified. The proposed delivery schedule requires final delivery of material within 118 days after the contract's effective date, with several preceding data submission and review milestones. Pricing must be submitted as Not-To-Exceed (NTE) or Firm Fixed Price (FFP), and must include a separate beyond-repair price.