53--WASHER,FLAT,REDUCED

Notice ID:N0010426QFC31

This is a contract for the manufacture of a special emphasis flat washer (NAS620C8) for a crucial Navy shipboard system, where defective material could cause serious injury, death, or loss of the ship. The final delivery of material is required 210 days after award, with certification data due 20 days prior to that delivery. Performance involves strict quality controls, configuration management, and compliance with specifications like MIL-STD-130. The material must be mercury-free and is designated as "Scope of Certification" material, invoking special control procedures. The primary point of contact for the solicitation is a Navy email address.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   NUTS AND WASHERS


Data sourced from SAM.gov. View Official Posting »

53--WASHER,FLAT,REDUCED

Total Small Business Set-Aside (FAR 19.5)
Notice ID:N0010426QFC31

This is a proposed acquisition for 55 units of a specific item (RA) to be delivered to the Portsmouth Naval Shipyard in Kittery, Maine. The contract is 100% set aside for small business concerns, with the specific type of set-aside (such as HUBZone or Service-Disabled Veteran-Owned) to be defined in the solicitation. Interested parties must obtain the necessary specifications and standards from the DoD Single Stock Point in Philadelphia, PA, primarily through the ASSIST-Online website.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
NAICS Not provided
  PSC   5310 NUTS AND WASHERS


Data sourced from SAM.gov. View Official Posting »

WASHER,FLAT,REDUCED

Notice ID:N0010426QFC31

This is a contract for the manufacture of a special emphasis flat washer (NAS620C8) for a crucial Navy shipboard system, where failure could result in serious injury, loss of life, or loss of the ship. The material is designated as Level I "Scope of Certification" and requires strict quality control procedures. The contractor must manufacture the item in accordance with NAS620 and mark it per MIL-STD-130, with a one-year warranty from the final delivery. A key performance timeline is a final material delivery 210 days after contract award. The work involves significant configuration control, requiring submission of certification data 20 days prior to delivery and the use of the Electronic Contractor Data Submission (ECDS) system for all data and waiver requests.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   NUTS AND WASHERS


Data sourced from SAM.gov. View Official Posting »