CONNECTOR,PENETRATI
The Navy requires manufacture of pressure-proof hull electrical penetrator/cable harness assemblies for the SSN 688 Class Vertical Launch System under EB Specification 3004/1, involving special-emphasis, quality-assured material with extensive certification, welding, nondestructive testing, and quality-system requirements. A destructive first-article penetrator assembly must be delivered to the Receiving Officer at Portsmouth Naval Shipyard, Building 240, Code 270, Kittery, ME, and FAT samples will not count against contract quantity. Final material delivery is required on or before 365 days after contract effective date, with certification CDRLs due 20 days before scheduled delivery, weld procedure/qualification data due 120 days after contract date, approval expected 60 days after receipt, and PNSY certification review 6 working days after receipt. The order is a DO-rated DPAS order, will consider past performance, and cites $59K for evaluation of first article testing. The small business set-aside has been dissolved, and access to any drawings must be requested through SAM.gov with follow-up to the solicitation POC.