PENETRATOR ASSY

Notice ID:N0010426QFB64

This is a complex, high-priority procurement for a "Penetrator Assembly," designated as SPECIAL EMPHASIS material for a crucial shipboard system where failure could result in serious injury, loss of life, or loss of the ship. The contract requires First Article Testing and has a proposed delivery schedule where final material delivery must occur on or before 365 days after the effective date of the resulting contract. The performance location is not explicitly stated in the provided description. No specific budget amount is listed. The solicitation is set aside for small businesses and carries a "DO" national defense priority rating.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »

PENETRATOR ASSY

Notice ID:N0010426QFB64

This is a contract for the manufacture of a Penetrator Assembly, designated as SPECIAL EMPHASIS material for a crucial shipboard system, requiring strict quality controls and First Article Testing. The final delivery of material must occur on or before 365 days after the effective date of the resulting contract. The work involves compliance with numerous military specifications and drawings, including NAVSEA drawings 6984846 and 6337554, and requires a certified quality system such as ISO-9001. The solicitation is set aside for small businesses and carries a national defense priority rating.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »

PENETRATOR ASSY

Notice ID:N0010426QFB64

This is a complex, high-priority contract for the manufacture and certification of a "Penetrator Assembly," designated as SPECIAL EMPHASIS material for a crucial shipboard system where failure risks are severe. The performance location is not specified. The final delivery of material is required on or before 365 days after the effective date of the resulting contract. The contract mandates First Article Testing with a report due 180 days after approval, and it requires a comprehensive quality system (e.g., ISO-9001) and extensive material traceability and certification. No budget amount is listed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »