PERISCOPE SUBASSEMB
This is a contract for the manufacture and delivery of a "Right Training Handle Stuffing Box Assembly," designated as SPECIAL EMPHASIS material for a crucial shipboard system, requiring extensive quality assurance and certification. The final delivery of material is due on or before 365 days after the effective date of the resulting contract. The work involves strict adherence to numerous military and industry specifications, including welding, pressure testing, and material traceability requirements. Performance will be subject to Government Quality Assurance at the source, and the contractor must maintain a quality system in accordance with standards like ISO-9001.