61--POWER SUPPLY
The requirement is for 34 power supplies (NSN 1HM 6130 015998882 X3) manufactured in accordance with IRPOD/TDP version 004. Delivery is required 180 days after contract award to DLA Distribution New Cumberland, PA, and DLA Distribution San Joaquin, Tracy, CA. The acquisition is 100% set aside for small business concerns and requires government source inspection. Technical documents such as drawings, IRPOD, and STRS are available through https://logistics.unnpp.gov/ after password registration, with no hard copies mailed. Interested parties must submit a completed and signed RFQ and should contact the listed contract specialist with their CAGE code to obtain solicitation materials.