CIRCUIT CARD ASSEMB
N0010426QDB21
This opportunity is for the repair of a CIRCUIT CARD ASSEMBLY under a firm fixed-price contract for the U.S. Navy. The required Repair Turnaround Time (RTAT) is 55 days after physical receipt of assets at the contractor's facility. The contractor must comply with Commercial Asset Visibility (CAV) tracking, MIL-STD-130 marking, and electrostatic discharge control standards. All repair work must meet the operational and functional requirements specified by the referenced cage code and part number. No budget amount or performance location is specified in the description.