POWER SUPPLY
This opportunity is for the fixed-price repair of a POWER SUPPLY, with a required turnaround time (RTAT) of 36 days after receipt of assets. The contractor must provide both a firm fixed-price for full repair and a beyond economic repair (BER) price. All repair work must meet the operational and functional requirements of the specified cage codes and reference numbers, and the contractor must comply with Commercial Asset Visibility (CAV) requirements. The contractor is responsible for all inspection and testing per original manufacturer specifications, with records kept for 365 days after final delivery. Performance location is not specified, and no budget amount is provided.